Our References

Discover some of our projects completed around the world.

PUMP STATION REHABILITATION PS3 – EMC Group engineering project
PUMP STATION REHABILITATION PS3

Client : Basrah Oil Company (BOC)

Location : Najaf, Iraq

Duration : 24 months

  • Engineering services for electrical pumps in site PS3 pump station.
Replacement of Turbine TK3 at the Feriana site – EMC Group engineering project
Replacement of Turbine TK3 at the Feriana site

Client : BAKER HUGE / SSE

Location : Feriana, Tunisia

Duration : 12 months

  • Replacement of Turbine TK3 : Detailed studies, dismantling, assembly, and commissioning. (Turbine Dismantling & Replacement, Civil Works, Mechanical & Piping package, E&I package,Fire detection package)
Engineering & PREPARATION OF A TD FOR THE CONSTRUCTION OF 02 TANKS ACCORDING TO API-650 – EMC Group engineering project
Engineering & PREPARATION OF A TD FOR THE CONSTRUCTION OF 02 TANKS ACCORDING TO API-650

Client : VIVO Energy

Location : Rades - Tunisia

Duration : 12 months

  • Engineering services and preparing a Tender Document for the Construction of Two Base Oil Tanks According to API 650
ENGINEERING SERVICES FOR TURNSTILE AND ACCESS CONTROL PROJECT – EMC Group engineering project
ENGINEERING SERVICES FOR TURNSTILE AND ACCESS CONTROL PROJECT

Client : YAZAKI

Location : GAFSA - TUNISIA

Duration : 8 months

  • Engineering services for Turnstile and access control Project
PROVISION OF ENGINEERING SERVICES- MASTER SERVICE CONTRACT – EMC Group engineering project
PROVISION OF ENGINEERING SERVICES- MASTER SERVICE CONTRACT

Client : TPS

Location : SFAX - Tunisia

Duration : 18 months

  • Generate and/or update the standard operating procedures and P&IDs of TPS onshore and offshore sites; HAZOP session; flame arrestors design review
Engineering/Construction and commissioning works of the vegetable oil refining unit – EMC Group engineering project
Engineering/Construction and commissioning works of the vegetable oil refining unit

Client : ACG

Location : Oran - Algeria

Duration : 18 months

  • Construction and commissioning works of the vegetable oil refining unit -Oilseed crushing complex (Mechanical & Piping package; E&I package; Fire detection package).
LOADING/UNLOADING CIRCUITS MODIFICATION – EMC Group engineering project
LOADING/UNLOADING CIRCUITS MODIFICATION

Client : STIR

Location : Bizerte - Tunisia

Duration : 6 months

  • Fuel-Oil and Virgin-Naphtha loading/unloading circuits modification engineering (Civil Engineering; Process Engineering; Mechanical & Piping Engineering; Electrical Engineering; C&I Engineering; F&G Engineering)
EPCC OF VEGETABLE OIL REFINING UNIT – EMC Group engineering project
EPCC OF VEGETABLE OIL REFINING UNIT

Client : ACG

Location : Oran - Algeria

Duration : 12 months

  • Engineering, procurement, and construction of the fire fighting system for the oilseed crushing, refining, and oil packaging complex in El Kerma (Oran province), (Mechanical & Piping Engineering for the preparation and refining units of the oilseed crushing, refining and oil packaging)
Basic and detailed engineering for the implementation of the gas bottle filling unit in Tataouine – EMC Group engineering project
Basic and detailed engineering for the implementation of the gas bottle filling unit in Tataouine

Client : CRYOCAN

Location : Tataouine - Tunisia

Duration : 6 months

  • Basic and detailed engineering for the implementation of the gas bottle filling unit in Tataouine . (Process Engineering, Civil Engineering, Mechanical & Piping Engineering, Electrical Engineering, C&I Engineering, F&G Engineering)
EPCC OF FIRE DETECTION SYSTEM – EMC Group engineering project
EPCC OF FIRE DETECTION SYSTEM

Client : AL ATHIR

Location : Bizerte, Tunis - Tunisia

Duration : 4 months

  • Engineering, Procurement, Installation, and Start-up of Fire detection System at Al Athir Workshops and Warehouse In Tunis and Bizerte
INTEGRATION OF THE NEW SEPARATOR VESSEL – EMC Group engineering project
INTEGRATION OF THE NEW SEPARATOR VESSEL

Client : STIR

Location : Bizerte, Tunis - Tunisia

Duration : 4 months

  • 3D modeling, conducting studies for the integration of the new separator vessel 02V301 into the UNIFINING section
HEAT TRACING SYSTEM FOR MAP CRYSTALLIZATION AND DRYING UNIT – EMC Group engineering project
HEAT TRACING SYSTEM FOR MAP CRYSTALLIZATION AND DRYING UNIT

Client : ALKIMIA

Location : Gabes, Tunisia

Duration : 4 months

  • Engineering Supply and technical assistance for the heat tracing system of the new 25,000 TM per year MAP crystallization and drying unit.
PROJECT MANAGEMENT TEAM PROVISION – EMC Group engineering project
PROJECT MANAGEMENT TEAM PROVISION

Client : Mazarine

Location : Tunisia

Duration : 12 months

  • Provision of Project Management Staff services (Construction Management; E&I package; Mechanical & Piping package).
ANAGUID EAST DEVELOPMENT PROJECT – EMC Group engineering project
ANAGUID EAST DEVELOPMENT PROJECT

Client : ECM+

Location : Tataouine, Tunisia

Duration : 14 months

  • Project Management & Supervision of Trunkline (50 km) and associated reception facilities and tie-ins at Waha CPF.
ENERGY AUDIT OF ELBAHHAR COMPANY – EMC Group engineering project
ENERGY AUDIT OF ELBAHHAR COMPANY

Client : Elbahhar Company+

Location : Zarzis/Tunisia

Duration : 3 months

  • Analysis of energy consumption, identification of waste, proposal of energy-saving solutions, estimation of potential savings, and provision of improvement recommendations.
ENERGY AUDIT OF NOVAPRINT & PACKAGING COMPANY – EMC Group engineering project
ENERGY AUDIT OF NOVAPRINT & PACKAGING COMPANY

Client : NOVA PRINT & PACKAGING

Location : Sfax /Tunisia

Duration : 8 months

  • Detailed analysis of consumption, identification of energy waste, proposal of energy-saving solutions, estimation of potential savings, and development of a prioritized action plan.
AWARENESS TRAINING ON PROTECTION METHODS IN ATEX EXPLOSION HAZARD ZONES – EMC Group engineering project
AWARENESS TRAINING ON PROTECTION METHODS IN ATEX EXPLOSION HAZARD ZONES

Client : Tunisian Chemical Group

Location : Gabes -Tunisia

Duration : 1 day

  • Awareness on Protection Methods in ATEX Explosion Hazard Zones / Protection Techniques / ATEX Equipment
Engineering, Supply & Installation Of Heating System – EMC Group engineering project
Engineering, Supply & Installation Of Heating System

Client : Brega Petroleum

Location : Libya

Duration : 2 months

  • Engineering, Supply & Installation Of Heating System Of 18'' Pipeline Misurata Jetty Underground Fuel Line Sections Replacement Project
Hydrogen Storage Station – EMC Group engineering project
Hydrogen Storage Station

Client : STIR

Location : Bizerte, Tunisia

Duration : 2 months

  • Engineering works for the realization of a hydrogen storage station
ANAGUID EAST DEVELOPMENT PROJECT – EMC Group engineering project
ANAGUID EAST DEVELOPMENT PROJECT

Client : Schlumberger

Location : Tatouine, Tunisia

Duration : 6 months

  • Engineering and installation of an electrical tracing system - ANAGUID EAST DEVELOPMENT PROJECT ( Engineering and construction of the electrical distribution system - ANAGUID EAST DEVELOPMENT PROJECT )
Survey and compliance of electrical installations – EMC Group engineering project
Survey and compliance of electrical installations

Client : Safran

Location : Slimen, Tunisia

Duration : 8 months

  • Survey and compliance of electrical installations in ZET zones (at SolimanD’Hari) and its annexes with a study of the protection of sites against lightning. Study and follow-up of the installation of the exterior lighting of the SAFRAN site (in SolimanD’Hari). SOFIMA: Statement and compliance of the Electrical installations of the production and storage units
Studies of The Gas Reducing Station – EMC Group engineering project
Studies of The Gas Reducing Station

Client : Duravit

Location : Bizerte, Tunisia

Duration : 3 months

  • Design of the gas reducing station and the distribution network (Civil Engineering. (Process Engineering; Mechanical & Piping Engineering; Electrical Engineering; C&I Engineering; F&G Engineering))
Heat Tracing System – EMC Group engineering project
Heat Tracing System

Client : Mazarine

Location : Tunisia

Duration : 3 months

  • Engineering, Supply & Construction of a Heating Tracing System
EPCC of A New Industrial Water Distributing System – EMC Group engineering project
EPCC of A New Industrial Water Distributing System

Client : Sorfert

Location : Algeria

Duration : 8 months

  • Engineering, Procurement, Construction and Commissioning of a new industrial water distributing system
CPF Storage Tanks Engineering – EMC Group engineering project
CPF Storage Tanks Engineering

Client : Chaudra/ Streicher

Location : Tatouine, Tunisia

Duration : 4 months

  • Storage Tanks Engineering (Civil; Mechanical & Piping; E&I ;F&G)
Installation of 7 Trucks Loading Stations – EMC Group engineering project
Installation of 7 Trucks Loading Stations

Client : Brega Petroleum

Location : Libya

Duration : 6 months

  • Engineering for the installation of 7 truck loading stations at the BREGA terminal in Tobruk
INSTALLATION OF A NEW ICSS SYSTEM – EMC Group engineering project
INSTALLATION OF A NEW ICSS SYSTEM

Client : Intech

Location : Libya

Duration : 6 months

  • Engineering for the construction of control rooms at the Beda field.

Each project reflects our expertise.

Contact us to discover how we can bring your projects to life internationally. Learn more about EMC Group or see our certifications.